Monday, January 31, 2011

WEEK 28 - 01/23/11 - 01/29/11

Brick has begun on the south end of the building and the site has received more concrete work including curbs and sidewalks. The electricians have begun the rough-in of the ceiling while removing the temporary lights. Drywalling continues to progress as well as the tie-in of HVAC equipment.

Brick
Curbs and Sidewalks


Drywall

HVAC Tie-In
7-Day Weather Forecast

Monday, January 24, 2011

WEEK 27 - 01/16/11 - 01/22/11

Forms were placed in preparation for pouring sidewalks. The interior walls received sheetrock while the fire protection lines continued to be installed.

Snowy Conditions
Masonry
Sidewalk Forms

Sheetrock


7-Day Weather Forecast

Monday, January 17, 2011

WEEK 26 - 01/09/11 - 01/15/11

We started installation of HVAC furnance units this past week. Sheetrock on the walls has started and joint compound materials arrived in preparation for the taping of sheetrock. The suspended ceiling has been completed, and the MEP roughs have started working on the ceilings.

Snowy Conditions

Insulation
Stocked Drywall
HVAC Units

Ceiling Tile Tracks
Drywall
Joint Compound Delivery
7-Day Weather Forecast

Monday, January 10, 2011

WEEK 25 - 01/02/11 - 01/08/11

Sheetrock has begun inside and the installation of fire sprinklers, gas lines, and ceiling tile tracks continues to move forward. The exterior has received more brick as well as storefront doors.

Concrete Curbing

Ceiling Tile Tracks

Storefront Doors
Drywall
7-Day Weather Forecast

Monday, January 3, 2011

WEEK 23 & 24 - 12/19/10 - 01/01/11

Over the last two weeks we have continued the rough-in of electrical, plumbing, HVAC, and fire sprinkler lines. We expect to be finished with the fire sprinklers within the next ten days. We continue to brick the exterior but progress has slowed due to some poor weather conditions. The steeple was set and we have poured the island curbing of the parking areas.

Steeple Installation

Brick Work

Island Curbing

Electrical, Plumbing, HVAC and Sprinkler Rough-in



7-Day Weather Forecast

Monday, December 20, 2010

WEEK 22 - 12/12/10 - 12/18/10

The weather has been extra cold this last week and has really slowed down progress. We hope to see better weather next week and are doing all we can to push through with what work can be done in these conditions. HVAC duct work, electrical rough-in, and fire suppression piping have been able to continue but with some delay.

Weather Conditions 7-Day Weather Forecast

Thursday, December 2, 2010

WEEK 19 - 21 - 11/21/10 - 12/11/10

Project is progressing well. Framing and roofing are complete. The plumbing rough is complete and the HVAC and electrical are more than half way done. Steel door frames are being installed. Drywall has begun, starting with the mezzanine areas. The exterior is well underway on receiving a Tyvek wrap. Storefront entryways are complete and brick masonry has just begun. All concrete curb has been poured, and we will start asphalt paving just prior to turnover. We are scheduled to start drywall in the classrooms next week.

Curbing
Brick Installation
Framing


Storefront Entry
Plumbing
Electrical
Steel Door Frames
Drywall

HVAC and Fire Suppression Lines


Site