Sunday, April 3, 2011

WEEK 37 - 03/27/11 - 04/02/11

This week the exterior walls of the building received more stucco along with the installation of engraved stone signs. Another section of sidewalks were poured on the south end of the building. A/C units were installed on the mechanical pads. The interior received the installation of wood cabinets and counter tops while partitions continued to be erected in the restrooms. Engraved Stone Signs

Sidewalk A/C Units

Wood Cabinets

Counter Tops
Partitions