WEEK 35 - 03/13/11 - 03/19/11

The walls and ceilings received more drywall mud and tape throughout the building, as well as sanding and texturing. The installation of tile is underway in the restrooms. The exterior received more masonry work, along with preparations for the installation of EFIS. The electricians set the power transformer and the concrete mechanical pad was poured.



EFIS Preparations



Transformer Box





Concrete Mechanical Pad



Ceramic Tile

Drywall Mud and Tape